- PM Modi visit USAOnly the mirror in my washroom and phone gallery see the crazy me : Sara KhanKarnataka rain fury: Photos of flooded streets, uprooted treesCannes 2022: Deepika Padukone stuns at the French Riviera in Sabyasachi outfitRanbir Kapoor And Alia Bhatt's Wedding Pics - Sealed With A KissOscars 2022: Every Academy Award WinnerShane Warne (1969-2022): Australian cricket legend's life in picturesPhotos: What Russia's invasion of Ukraine looks like on the groundLata Mangeshkar (1929-2022): A pictorial tribute to the 'Nightingale of India'PM Modi unveils 216-feet tall Statue of Equality in Hyderabad (PHOTOS)
Freya Deshmane riding on Reinroe Adare Acrobat claimed the top spot and clinched the gold
- Salah sets Premier League record in Liverpool's draw at Newcastle
- India Open Competition in Shotgun begins in Jaipur, paving way for Nationals' qualification
- Hockey India names Amir Ali-led 20-man team for Junior Asia Cup
- Harmanpreet Singh named FIH Player of the Year, PR Sreejesh gets best goalkeeper award
- World Boxing medallist Gaurav Bidhuri to flag off 'Delhi Against Drugs' movement on Nov 17
Russian company starts equipment production for two reactors at Kudankulam Last Updated : 01 Feb 2017 01:31:29 PM IST (File photo)
ZiO-Podolsk, the machine engineering arm of Russian nuclear group Rosatom's subsidiary Atomenergomash has started production of equipments for the third and fourth nuclear power units to be set up in Kudankulam in Tamil Nadu, it was announced on Tuesday.
In a statement issued on Tuesday, Rosatom, Russia's state atomic energy corporation, said an initial meeting was held at the machine building plant of ZiO-Podolsk with representatives of India's Nuclear Power Corporation of India Ltd (NPCIL) and other organisations.
The meeting was held to check the plant manufacturing readiness for production and it was decided to launch the production of equipments, components and spare parts.
The manufacturing readiness was also determined for production of components and spare parts for separate collector and condensate collector.
ZiO-Podolsk will produce eight sets of separator super heaters and the same number of high-pressure pre-heaters for the new reactors at Kudankulam.
In 2003-2004, ZiO-Podolsk manufactured and sent the equipments for the first two 1,000 MW atomic power reactors at Kudankulam.
In addition to machine hall equipment, Atomenergomash supplies a range of key equipment for the nuclear steam supply system (NSSS) like the steam generators, main circulating pump, pressure compensation valve and main circulation pipeline for the third and fourth units at Kudankulam.
Excavation works for Kudankulam units 3 and 4 are in progress. The first concrete for the new units will be poured in March 2017.
In December 2014, Moscow and New Delhi signed a document on strategic vision of serial construction of nuclear power units in India by using Russian technology.
The document outlines plans for the construction of more than 12 nuclear power units in India, at Kudankulam site as well, Rosatom added.
IANS For Latest Updates Please-
Join us on
Follow us on
172.31.16.186